Castelle FaxPress Specifications Page 637

  • Download
  • Add to my manuals
  • Print
  • Page
    / 674
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 636
CTR21 Declaration Appendix D: Agency Compliance
D—9
Note: Users should not attempt to make such connections themselves, but
should contact the appropriate electric inspection authority, or
electrician, as appropriate.
LOAD NUMBER: The Load Number (LN) assigned to each terminal device
denotes the percentage of the total load to be connected to a telephone loop which
is used by the device to prevent overloading. The termination on a loop may
consist of any combination of devices subject only to the requirement that the total
of the Load Numbers of all the devices does not exceed 100.
CTR21 Declaration
Castelle FaxPress servers have been approved [Commission Decision 98/482/EC
- CTR21] for pan-European terminal connection to the Public Switched Telephone
Network (PSTN). However, due to differences between the individual PSTNs
provided in different countries, the approval does not, of itself, give an
unconditional assurance of successful operation on every PSTN termination point.
In the event of problems, you should contact your equipment supplier in the first
instance.
Page view 636
1 2 ... 632 633 634 635 636 637 638 639 640 641 642 ... 673 674

Comments to this Manuals

No comments